NOW DEVELOPING / 20 MW PROJECT / UNDER 120 DAYS TO LIVEBOOK A SITE CALL ↗
NORTH AMERICA / PROJECT 01
LOCATION / CONFIDENTIAL

AI INFRASTRUCTUREBUILT AT THEEDGE OF POSSIBILITY.

Silicon Oasis develops AI infrastructure projects through a proprietary model designed for differentiated unit economics and accelerated time to live.

Conceptual editorial image of compute and power components
CONCEPTUAL EDITORIAL IMAGE
Conceptual editorial image representing the Silicon Oasis development model
20 MWACTIVE DEVELOPMENT / UNDER 120 DAYS TO LIVE
CONCEPTUAL EDITORIAL IMAGE / NOT A SITE REPRESENTATION
STRATEGIC LOCATION ◆ INDUSTRIAL SCALE ◆ RESILIENT CONNECTIVITY ◆ AI-READY DEVELOPMENT ◆ STRATEGIC LOCATION ◆ INDUSTRIAL SCALE ◆ RESILIENT CONNECTIVITY ◆ AI-READY DEVELOPMENT ◆
03 / ROADMAP

20 MW LIVE
IN <120 DAYS.

The active project follows a compressed delivery program from engineering through commissioning. Beyond this deployment, Silicon Oasis has 1 GW of projects in its North American pipeline.

Existing completed industrial shell for Phase 1
PHASE 1 / EXISTING SHELLTHE PHYSICAL
STARTING POINT.
ACTUAL SITE IMAGE / SUPPLIED PROPOSALLOCATION CONFIDENTIAL
00NOW

DEVELOPMENT

20 MW project in active development with partners and requirements aligned.

30DAYS

ENGINEERING

Power, network, civil, cooling, and operating designs finalized.

75DAYS

BUILD + INTEGRATE

Critical infrastructure delivered, installed, and integrated.

<120DAYS

GO LIVE

Commissioned capacity transitions into operational service.

THE BEST AI SITES AREN’T LISTED. WE ORIGINATE THEM.

PROPRIETARY ORIGINATION

Silicon Oasis creates proprietary infrastructure opportunities around real compute demand, then executes them in under 120 days.

EXCLUSIVE ACCESS. BETTER ECONOMICS. FASTER DEPLOYMENT.

01 / DISLOCATION SOURCING02 / DEMAND SECURED03 / CAPITAL EFFICIENT04 / <120 DAYS TO LIVE
01 / SITE

20 MW.
BUILT FOR UPTIME.

A high-density infrastructure site designed around measurable power delivery, redundant critical systems, and phased deployment. Specific location and operating details remain confidential.

Conceptual editorial image representing modular power-to-compute infrastructure
POWER → COMPUTECAPACITY ENGINEERED FOR HIGH-DENSITY WORKLOADS
CONCEPTUAL EDITORIAL IMAGENOT A SITE REPRESENTATION
01 / DENSITYAICOMPUTE READY

Power and facility planning structured for high-density AI workloads.

02 / METERINGUTILITYMETERED

Dedicated measurement and operational visibility at the site level.

03 / RESILIENCEREDUNDANTBY DESIGN

Critical power and operating systems designed to minimize single points of failure.

04 / DELIVERY<120DAYS TO LIVE

Target delivery window from project start to operational activation.

FIG. 01 / SITE SPECIFICATIONPROJECT PARAMETERS
[ ACTIVE + PIPELINE PROJECTS ]

ONE PLATFORM.
THREE DEPLOYMENTS.

Each project is developed as an independent infrastructure program. Location details will be released when appropriate.

PROJECT / 01
EXECUTING NOW

PHASE 1

Initial 5 MW deployment within a planned 20 MW campus, designed for accelerated AI compute activation.

LOCATION / COMING SOON
5MW / PHASE 1
20MW / CAMPUS
2,100NVIDIA B300 GPUs
<120DAYS TO LIVE
PROJECT / 02
COMMERCIAL DEVELOPMENT

20 MW DEAL

A separate 20 MW AI infrastructure opportunity progressing through commercial and delivery development.

LOCATION / COMING SOON
20MW / PROJECT CAPACITY
HARDWARE / TO BE ANNOUNCED
DELIVERY / TO BE ANNOUNCED
PROJECT / 03
PIPELINE SITE

100 MW SITE

A large-scale site in the North American pipeline, planned as a phased platform for future AI infrastructure demand.

LOCATION / COMING SOON
100MW / SITE CAPACITY
PHASEDDELIVERY MODEL
HARDWARE / TO BE ANNOUNCED
02 / INFRASTRUCTURE

ONE SITE.
EVERY CRITICAL SYSTEM.

The development framework brings power, connectivity, land, cooling strategy, and operations into one coordinated site plan. Final specifications are defined with qualified partners.

SILICON OASIS / DEVELOPMENT FORMULA PROPRIETARY MODEL
Conceptual editorial detail of compute and power componentsCONCEPTUAL EDITORIAL IMAGE
01 / SOURCEHIDDEN CAPACITYFIND INFRASTRUCTURE STRANDED BY INDUSTRIAL CHANGE
02 / CONTRACTDEMAND FIRSTALIGN COMMERCIAL DEMAND BEFORE CAPITAL DEPLOYMENT
03 / CAPITALIZEUNIT ECONOMICSSTRUCTURE EACH PROJECT AROUND CONTRACTED CASH FLOWS
04 / EXECUTE<120 DAYSPARTNER-LED DELIVERY WITH SILICON OASIS GOVERNANCE
FIG. 2.1

POWER

Capacity strategy structured around the needs of high-density AI workloads.

SPECIFICATION / IN DEVELOPMENT
FIG. 2.2

CONNECTIVITY

Resilient network planning with diversified routes into major infrastructure markets.

SPECIFICATION / IN DEVELOPMENT
FIG. 2.3

CLIMATE DESIGN

Site systems engineered for local conditions and operational efficiency.

SPECIFICATION / IN DEVELOPMENT
FIG. 2.4

LAND + SCALE

A campus framework that can expand in disciplined, repeatable phases.

SPECIFICATION / IN DEVELOPMENT
[ FOR OPERATORS / TENANTS / PARTNERS ]

BUILD AI
INFRASTRUCTURE
WITH US.

04 / CONTACT

BOOK A
SITE CALL.

Tell us what you are building and the infrastructure profile you need. We will respond with the most relevant next step.

DIRECT PROJECT INQUIRY / QUALIFIED REQUESTS

Required fields are marked by validation.